NARVA INDUSTRIAL PARK

Narva Industrial Park includes the two territories that are located at the south-western outskirts, in the industrial area:  Kadastiku Industrial Park (65 ha) and Kulgu Industrial Park (65 ha).

  • Detailed planning process complete
  • During the first stage (Kadastikus 65 ha) the infrastructure fully built – electricity (12 MW), central heating, water, sewerage, Internet communications, roads and street lighting
  • During the second stage (Kulgu 65 ha) the infrastructure fully built – electricity (10 MW), gas, water, sewerage, Internet communications, roads and street lighting
  • 2/3 of plots are available
  • Private investments to date: five industrial sites and two logistics centres – 70 million EUR in total

Kadastiku Industrial Park is the first of our industrial parks which was built in 2012. Kadastiku Industrial Park consists of 35 land plots with the surface area of 0.5 ha to 3.5 ha, and the total surface area of the park makes up 65 ha.

The industrial park has new water supply, sewage, central heating, gas, fiber-optic communication routes, and on-site roads with street lighting have been built here. Connecting to all of the utilities listed above is included into the price of the land plot. You must pay separately for connecting to the electricity supply system (135 EUR per 1 kW of allocated capacity). On the territory of the industrial park, there are three electric power substations with the total capacity of 12 MW, out of which 8 MW is free at the moment.

Kulgu Industrial Park is a new industrial park in Narva, and the infrastrustructure on its territory is being built in 2017. Kulgu Industrial Park consists of 39 land plots with the surface area of 0.5 ha to 2.5 ha, and the total surface area of the park makes up 65 ha.

The industrial park has new water supply, sewage, gas, fiber-optic communication routes, and on-site roads with street lighting have been built here. Connecting to all of the utilities listed above is included into the price of the land plot. You must pay separately for connecting to the electricity supply system (135 EUR per 1 kW of allocated capacity). On the territory of the industrial park, there are three electric power substations with the total capacity of 8 MW.